Field trip to ACC!!
BBQ lunch,
Tour of facility shops and classrooms.
Meet with In
Meeting with apprenticeship instructors and
Ken Falloon the apprenticeship coordinator.
In the meantime watch this video on the issues around water borne wastes and the notion that there is no such thing as downstream. We are all downstream of something.
National Film Board presents Crapshoot: The Gamble with our Wastes
Tuesday, September 12, 2017
Monday, September 11, 2017
Week 29, Day 2
Onsite Wastewater Management systems Manitoba Regulations
Onsite Wastewater Management Installers Program
September 25 - 29, 2017 -- 8:00 a.m. - 4:00 p.m.
Fee: $1000.00 (No taxes)
Location:
Red River College
2055 Notre Dame Avenue
Homeowner’s Manual for Onsite Wastewater Management Systems
Onsite Wastewater Management Installers Program
September 25 - 29, 2017 -- 8:00 a.m. - 4:00 p.m.
Fee: $1000.00 (No taxes)
Location:
Red River College
2055 Notre Dame Avenue
Homeowner’s Manual for Onsite Wastewater Management Systems
Week 29, Day 1.
Field trip, across the yard. Interlake Water Supply are working on new housing units setting holding tanks and setting up pumps.
Individual septic tanks will be used as holding tanks for the time being but may eventually have the effluent chamber hooked up to the sewer main. A modified forced main system.
They were installing a 1 hp submersible pump down an adjacent 120ft well to supply all three units. The system will use a single 20 gallon pressure tank with a cycle stop valve. Check out the operation here.
Individual septic tanks will be used as holding tanks for the time being but may eventually have the effluent chamber hooked up to the sewer main. A modified forced main system.
They were installing a 1 hp submersible pump down an adjacent 120ft well to supply all three units. The system will use a single 20 gallon pressure tank with a cycle stop valve. Check out the operation here.
Thursday, September 7, 2017
Week 28, Day 5
Working up a price for the Peguis Infrastructure Building. Very basic plumbing with a WC, lav and KS.
Also want a section of radiant floor heating.
Designing radiant floor heating systems
Using the 30 day trial version of LoopCAD program
http://www.avenir-online.com/AvenirWeb/Store/Purchase.aspx
for an area 24 x 80 with 15" spacing for 1/2" pex pipe.
Also want a section of radiant floor heating.
Designing radiant floor heating systems
Using the 30 day trial version of LoopCAD program
http://www.avenir-online.com/AvenirWeb/Store/Purchase.aspx
for an area 24 x 80 with 15" spacing for 1/2" pex pipe.
Wednesday, September 6, 2017
Week 28, Day 4
K45 Drain Gun
K50 Sectional Machine
Next size up drain cleaner for municipal systems.
Tuesday, September 5, 2017
Week 28, Day 3
A couple of videos about circuit venting and wet venting. These videos are more about commercial rather than residential settings but they provide a good summary of the general rules for applying, designing and sizing these piping arrangements. Refer to the NP C sections 2.5.2 Wet Venting and 2.5.3 Circuit Venting.
Circuit Venting Circuit Venting vs Wet Venting
Circuit Venting Circuit Venting vs Wet Venting
Week 28, Day 2
After a lovely long week end. Two weeks left. Last week will be practical testing, then practicum.
Now on to drain cleaning tools.
Ridgid Drain cleaning tools and related equipment.
Now on to drain cleaning tools.
Ridgid Drain cleaning tools and related equipment.